Documentation, samples, methodology
Resources.
Architecture briefs, sample reports, security documentation, methodology notes, and buyer checklists. Soft-gated — email optional, never required. LumeTrax® doesn't enrich submitted emails from third-party data brokers.
Architecture
How LumeTrax is built.
Architecture Brief
The unified-platform architecture: tenant hierarchy, OT/IT separation, ingestion topology, module activation model, deployment shapes.
Brochure
Platform overview for executive / commercial readers — what LumeTrax is, who it's for, how it's different.
OT/IT Separation Diagram + Note
The architectural commitment, drawn out at engineering depth — what stays in OT, what runs in shared platform services, why.
Sample reports
The deliverables, anonymised.
Vision Quarterly Performance Report (sample)
Anonymised quarterly performance report — weather-normalized PR, availability decomposition, loss attribution waterfall, plant ranking, methodology footnote.
Download →Audit & Assurance Bankability Review (sample)
Anonymised lender-format technical review — source-classified executive summary, full methodology, reconciliation, counterparty allocation.
Download →Customer Security Pack
Architectural overview, deployment shapes, identity model, encryption + tenant isolation, data residency, sub-processors, certification status (dated), incident response, RPO/RTO, pre-completed CAIQ + SIG.
Download →All samples carry a discrete watermark and use synthetic numbers. No real customer name, no real client logos, no real figures. The structure and methodology are real.
Methodology
How we calculate what we calculate.
Loss Attribution Methodology
How LumeTrax decomposes the gap between expected and actual production — definitions, calculation logic, source-link conventions, worked examples.
Availability Decomposition Methodology
Time-based, capacity-weighted, per-attribution-category — including counterparty allocation rules under contract ambiguity.
Request →Performance Ratio + Weather Normalization
PR computation against weather-normalized expected output, model assumptions, applicability constraints.
Request →Buyer checklists — ungated
Before you commit.
Vendor-neutral evaluation rubrics. Self-scoring rows so a procurement team can apply them during a vendor selection. Useful enough that we'd rather they be widely shared than friction-gated.
Reference projects
Live deployments.
14 MWp PV · Petroleum sector · 2023
Reference Project — 14 MWp PV in Petroleum Sector
Anonymised reference deployment context, modules deployed, architecture, lender / IE relevance.
More to come
Additional reference projects
Added as customer disclosure permits.